Skip to content

Release checklist polish in release_gate_geotiff.rst (#2345 PR 3) #2381

Closed

Description

@brendancol

Part of epic #2345.

Goal

Make docs/source/reference/release_gate_geotiff.rst usable as the maintainer-facing go / no-go gate for the GeoTIFF-focused release.

Scope

Audit the existing checklist and, for each promised tier row, make sure all of the following are present:

Then add a short "how a maintainer runs this gate" section at the top:

  • The pytest selection or marker that runs the gated tests.
  • What to do when a row is intentionally skipped (e.g. GPU unavailable).
  • The decision rule for promoting or demoting a tier based on gate output.

Out of scope

  • Adding new tests. If a gate row points at a missing test, file a follow-up rather than writing it here.
  • Rewriting the tier table in geotiff.rst.

Acceptance

  • Every gate row has acceptance + test path + epic link + tier.
  • The new "how to run" section is present at the top.
  • A maintainer can decide ready / not ready by walking the checklist top to bottom.
  • Sphinx build succeeds without new warnings.

Activity

  1. added 3 commits that reference this issue on May 25, 2026
    9887d72
    a915b68
    a8e73cc
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions